Introduction
During field development activities, there is always uncertainty in identifying the surface production potential of the wells drilled in the reservoir. To minimize risks, temporary equipment is initially used to define key production fluid parameters before investing in permanent facilities, which are expected to have a long useful life.
Moreover, strict compliance with all national and international regulations determines the level of acceptability that companies have in their process safety matrix, as well as the thorough evaluation of primary and residual risks when implementing preventive and mitigation measures in the facilities to be installed.
This webinar will present to participants the upstream experience in implementing Process Safety for Early Production Facilities (EPF) in the development of an oil field in Latin America.